Contract No. N-11777 (COMPLETED)
Shifting of 140MVA Power Transformer from Ghantoot to Al Wathba 220-33kV Substation

Project Manager - Engr. Jun Cris Lubang
Civil Engineer - Yasser Semary
Civil Engineer - Peter Andrews


Site Engineer - Ali Abdelaal
Safety Officer - Henry Cunanan
April 01, 2012

Preparation for 220kV HV Test

140MVA Transformer Marshalling Kiosk

ProtectionPanel Works

SF6 Filling for 220kV Bus duct

Preparation for HV Electrical Test

Preparation for Sunshield of 220kV Power Cable

220kV CT Testing

Witnessing for 140MVA Power Transformer

220Kv GIS Bus duct Termination

Fire sealant Fixing for 33kV GIS Opening

Protection Panel Works
May 1-6, 2012 - Protection Works / 140MVA Transformer Marshalling Kiosk / SF6 Filling for 220kV Bus duct
April 25-30, 2012 - 140MVA Transformer Pressure Test/140MVA Transformer Scheme Check/Laying of 33kV Power Cable at Basement

140MVA Transformer Pressure Test


140MVA Transformer Scheme Check

Laying of 33kV Power Cable at Basement

Sunshield Installation for 220kV Bus Duct

Termination of 33kV Power Cable

140MVA Transformer Pressure Test

Termination of 33kV Power Cable


220kV Outdoor Termination (CSE)


Termination of 33kV Power Cable

33kV Power Cable Support Fixing

33kV Power Cable Support Fixing

Protection Relay Testing Activity

140MVA Transformer Scheme Check

220kV GIB Termination

SF6 Filling for 220kV Bus Duct
April 10-24, 2012 - 140MVA Transformer Testing

220kV Transformer Protection Scheme Checking

Panel wiring

20MVA P.U. Relay Testing

140MVA Transformer Testing

140MVA Transformer Testing

140MVA Transformer Testing

Oil sampling at 20MVA Transformer

Drilling hole for 33Kv GIS Opening

Pressure Test at 140MVA Power Transformer

220kV Outdoor Termination


220kV Busduct Connected with the
140MVA Power Transformer

220kV GIB Duct Installation

11kV VLF Testing

220kV Outdoor Termination Installation

220kV GIB Duct Installation

New 33kV GIS Panel

Bore holing for Earth Pit

140MVA Transformer Testing

Bore holing for Earth Pit

20MVA P.U. Relay Testing
April 07, 2012 - 220kV Cable Pulling

220kV Cable Pulling


220kV Cable Pulling

Control Cable at 140 MVA Transformer

Protection Panel wiring

Lighting Post fixing

April 01, 2012

March 23, 2012 -20MVA package unit / Fixing of 33kV cable for 140 MVA Transformer

Control Cable for 140 MVA

Fencing works at 20 MVA package unit

Relay Testing at 20 MVA package unit
March 03, 2012 -Transport of 140 MVA power transformer
January 09, 2012 - Package Unit Foundation 5 / Package Unit Foundation 6 / Transformer Cable Duct 4
December 27, 2011 - Access Road Construction - Site Office MobilizationMobilization - Road Compaction Test
December 04, 2011 - Site Visit

| Home | Policy | News | Services | Reference List | Location Map |
____________________________________________________________________________________________

REMCON ELECTRICAL - ABU DHABI - UAE
Silver Building, Al Dhafra St. (Street # 4) - Mezzanine Floor M1-M2
P.O. Box 29497 - Abu Dhabi. United Arab Emirates - Tel. No. +971-2-4458030 - Fax No. +971-2-4458035

REMCON ENGINEERING - SHARJAH -UAE
Phone +971 6 539 2281 - Fax No. +971 6 539 2282 - P.O. Box. 71265, Sharjah - United Arab Emirates

E-mail :info@remcon.ae